Most strata corporations in BC require written approval before a kitchen renovation starts, and your building's own bylaws decide what needs approval, what you submit and how long it takes. The usual path is to read the bylaws, ask the property manager for the renovation or alteration request form, submit a scope with drawings and your contractor's insurance, and wait for the council's answer in writing before any work begins. Replacing cabinets in the same layout tends to draw few questions. Moving plumbing, changing flooring or touching a wall draws more. This is the general picture, not legal advice, and the strata and its bylaws are the authority for your building.
In a strata, your unit sits inside a building that the owners share. The pipes in the walls, the structure, the floors between units and the exterior are often common property or affect it, and a renovation can change noise, water risk and access for your neighbours. BC's Strata Property Act sets the framework and each building's bylaws fill in the detail, so two buildings on the same street can have different rules. That is why the first step is your own building's documents, not a general checklist.
Ask the property manager or the council for the current bylaws, including any amendments, and any renovation policy or form. Look for what counts as an alteration that needs approval, the permitted work hours, rules on elevators and deliveries, flooring and sound rules, and whether the strata asks for a deposit or a signed agreement before work starts. Some buildings ask the owner to accept responsibility in writing for the alteration and any damage it causes. If anything is unclear, ask in writing and keep the answer. If a bylaw question decides your plans, a lawyer who works with stratas is the right person to ask.
The request is a short package. A description of the work. Drawings of the new kitchen showing what changes and what stays. Product details for anything that affects the building, such as flooring or a range hood and how it vents. The contractor's name, licence where one applies, and proof of insurance. A schedule with start and end dates. Some stratas approve at the office level and others wait for a council meeting, so allow a few weeks, and submit before you order anything that cannot be changed. Get the approval in writing, with any conditions attached.
Cabinets on their own rarely worry a strata, because they sit inside your unit. The questions come from the parts that connect to the building. Moving a sink or a dishwasher means new drain and supply lines, often a water shut-off that affects other units, and work by a licensed plumber. New flooring can trigger rules on underlay and sound transmission to the unit below. A range hood that vents outside needs a hole in an exterior wall, which is usually common property. New circuits or panel work involve the building's electrical. Opening a wall raises the question of whether it is structural or shared. Keep the services where they are and the application gets simpler, and so do the budget and the schedule.
An approval usually comes with rules for how the work happens: weekday hours with limits on noisy work, a booked and padded service elevator, sometimes a deposit, parking for the trades, a loading zone for deliveries and rules for construction waste. Every part of the project has to fit inside those limits, including the day the cabinets arrive. Our cabinets come pre-assembled, so the install inside the unit is measured in days and the delivery can usually be planned around one elevator booking. Start the application as soon as the design drawings exist, because an approval can take as long as building the cabinetry, which is about 4 weeks as our standard.
We design and build the cabinetry, and we supply the cabinet drawings and product details a strata application asks for. The trades side of the form, plumbing, electrical, flooring and insurance, comes from your contractor and the licensed trades doing that work. A typical condo kitchen plans in our small band, about $18,000 to $28,000, and a larger unit with an island can move into the $30,000 to $50,000 range where most of our projects land. These are planning ranges, not quotes, and your strata's conditions are part of the real number, so bring the bylaws to the first meeting.
For the rest of a condo kitchen, from the elevator to the layout, read condo kitchen renovation in downtown Vancouver, and for City permits, which are separate from strata approval, see kitchen renovation permits in Vancouver. Each step is on our process page, the Vancouver Kitchen Cost Calculator gives you a rough range, and you can book a free consultation with your floor plan and bylaws in hand.